Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 09/20/21 in all areas

  1. Hi Andrew, You can add the Path position distributor for first level branches, but temporarily disable the Path distributor for this level. This way you'll have one branch for the first level. The position can be set to 50%, or any other. After tweaking your branches, turn off PathPos distr and turn on Path distr again. The same can be done with other branch levels. Thanks!
    1 point
×
×
  • Create New...